(1) A project Calendar that shared by the team. Team member should be able to add events to the calendar.
How to use the existing Calendar widgt? I couldn't find anything about it.
(2) Would it be great to give people the option that documents have to be checked out/checked in to modify?
Team Elements is great! Wish to see these features added if they make any sense :)
Thanks a lot!